All Documents current as of 6/27/19
- Attachment A: Construction Drawings for Woodstock Dike Trailhead
- Attachment B: Construction Drawings for Ashokan Station Trailhead
- Attachment C: Special Specifications for Woodstock Dike Trailhead
- Attachment D: Special Specifications for Ashokan Station Trailhead
- Attachment E: Stormwater Pollution Prevention Plan (“SWPPP”) for Woodstock Dike Trailhead
- Attachment F: Stormwater Pollution Prevention Plan (“SWPPP”) for Ashokan Station Trailhead
- Attachment G: Project Labor Agreement (“PLA”)
- Attachment H: Prevailing Wage Rate Schedule
- Attachment I: Survey and Basemapping Information
- Attachment J: Environmental Soil Sampling Program Results
- Attachment K: NYSDOT Highway Work Permit
- Attachment L: Nationwide Permit General Conditions
- Attachment M: Special Notes for Ashokan Station Trailhead
- Attachment N: Vendor Revised Bid Price Return Form
- Attachment O: NYSDOT Highway Work Permit No. 20190879108